ORCHARD PARKWAY over LOCAL DRAINAGE
0.2 MI EAST OF HURON ST. · County 001, Colorado · Built 2015 · 5 Lanes · 4,895 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
39.953931, -104.993792
This bridge is in worse condition than 22.8% of bridges in County 001. The average bridge in Colorado is 0 years old; this one is 11 years old.
Nearby Bridges
144TH AVE over WEST FRONTAGE RD
Built 2006
144TH AVENUE over I-25 ML
Built 2007
144TH AVE over EAST FRONTAGE RD
Built 2006
GRANT STREET over LOCAL DRAINAGE
Built 2018
136TH AVENUE over I-25 ML
Built 2004
WASHINGTON STREET over LOCAL DRAINAGE
Built 2010
HURON ST over QUAIL CREEK
Built 2006
WASHINGTON ST over BIG DRY CREEK
Built 1993
WASHINGTON STREET over LOCAL DRAINAGE
Built 2018
HURON ST over SHAY DITCH
Built 2006
Bridge Details
- Structure #
- WST26-06-W
- Year Built
- 2015
- Length
- 8.6 m (28.2 ft)
- Max Span
- 8.6 m
- Width
- 37.8 m (124 ft)
- Lanes
- 5
- Daily Traffic
- 4,895
- Material
- Concrete
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.