PINON ROAD over FARM ROAD B

2 MI NE OF EXIT 110-I25 · County 101, Colorado · Built 2004 · 2 Lanes · 217 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
PUCO 0.77-110C
Year Built
2004
Length
6.2 m (20.3 ft)
Max Span
6.2 m
Width
32.3 m (106 ft)
Lanes
2
Daily Traffic
217
Material
Steel
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.