I 25 ML SBND over DRAW
4.5 MI S OF EL PASO-PUEBL · County 101, Colorado · Built 2021 · 2 Lanes · 37,000 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
38.458103, -104.608292
This bridge is in worse condition than 36.2% of bridges in County 101. The average bridge in Colorado is 0 years old; this one is 5 years old.
Nearby Bridges
I 25 ML NBND over DRAW
Built 1958
I 25 ML NBND over DRAW
Built 1958
CO RD 501/Overton over UNNAMED DRAINAGE
Built 1994
PINON ROAD over FARM ROAD A
Built 2004
PINON ROAD over FOUNTAIN CREEK
Built 2004
PINON ROAD over FARM ROAD B
Built 2004
I 25 ML SBND over YOUNG HOLLOW
Built 1998
I 25 ML NBND over YOUNG HOLLOW
Built 1958
I 25 ML NBND over STEEL HOLLOW
Built 1958
I 25 ML SBND over STEEL HOLLOW
Built 2006
Bridge Details
- Structure #
- K-18-UA
- Year Built
- 2021
- Length
- 9.3 m (30.5 ft)
- Max Span
- 4.3 m
- Width
- 29.4 m (96.5 ft)
- Lanes
- 2
- Daily Traffic
- 37,000
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $618,000
- Total Project Cost
- $927,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.