I 25 ML NBND over STEEL HOLLOW
7.2 MI N OF JCT US 50 W S · County 101, Colorado · Built 1958 · 2 Lanes · 17,500 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
38.410039, -104.613578
This bridge is in worse condition than 70.2% of bridges in County 101. The average bridge in Colorado is 0 years old; this one is 68 years old.
Nearby Bridges
I 25 ML SBND over STEEL HOLLOW
Built 2006
CR501/OVERTON RD over UNNAMED DRAINAGE
Built 2003
PINON ROAD over FARM ROAD A
Built 2004
PINON ROAD over FOUNTAIN CREEK
Built 2004
PINON ROAD over FARM ROAD B
Built 2004
CO RD 501/Overton over UNNAMED DRAINAGE
Built 1994
I 25 ML NBND over PORTER DRAW
Built 1958
I 25 ML SBND over PORTER DRAW
Built 2006
I 25 ML NBND over DRAW
Built 1958
I 25 ML SBND over DRAW
Built 2021
Bridge Details
- Structure #
- K-18-CG
- Year Built
- 1958
- Length
- 56.2 m (184.4 ft)
- Max Span
- 15.2 m
- Width
- 10.4 m (34.1 ft)
- Lanes
- 2
- Daily Traffic
- 17,500
- Material
- Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $225,000
- Total Project Cost
- $338,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.