I 25 ML NBND over PORTER DRAW

10.3 MI S OF EL PASO-PUEB · County 101, Colorado · Built 1958 · 2 Lanes · 17,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
K-18-CH
Year Built
1958
Length
46.9 m (153.9 ft)
Max Span
15 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
17,500
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.