COUNTY ROAD 501 over DRY WASH
3.6 MI N OF SH47 · County 101, Colorado · Built 1995 · 2 Lanes · 359 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
38.356081, -104.607731
This bridge is in worse condition than 21.9% of bridges in County 101. The average bridge in Colorado is 0 years old; this one is 31 years old.
Nearby Bridges
I 25 ML over DRAW
Built 1928
I 25 ML over DRAW
Built 1928
I 25 ML NBND over Drew Dix Parkway
Built 1960
I 25 ML SBND over Drew Dix Parkway
Built 1960
DILLON DR. EAST FR over TERRAIN
Built 2024
DILLON DRIVE over I25 ML
Built 2015
I 25 ML SBND over PORTER DRAW
Built 2006
I 25 ML NBND over PORTER DRAW
Built 1958
I 25 ML over EAGLE RIDGE BLVD.
Built 2005
NORTH DILLON DRIVE over UNION PACIFIC RR
Built 2000
Bridge Details
- Structure #
- PUCO 2.85-501BR
- Year Built
- 1995
- Length
- 8.2 m (26.9 ft)
- Max Span
- 7.6 m
- Width
- 9.9 m (32.5 ft)
- Lanes
- 2
- Daily Traffic
- 359
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.