I 25 ML over EAGLE RIDGE BLVD.

14.1 S OF EL PASO-PUEBLO · County 101, Colorado · Built 2005 · 4 Lanes · 36,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
K-18-FB
Year Built
2005
Length
61 m (200.1 ft)
Max Span
30.1 m
Width
35.6 m (116.8 ft)
Lanes
4
Daily Traffic
36,000
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.