I 25 ML over EAGLE RIDGE BLVD.
14.1 S OF EL PASO-PUEBLO · County 101, Colorado · Built 2005 · 4 Lanes · 36,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
38.320233, -104.6153
This bridge is in worse condition than 36.2% of bridges in County 101. The average bridge in Colorado is 0 years old; this one is 21 years old.
Nearby Bridges
NORTH DILLON DRIVE over UNION PACIFIC RR
Built 2000
I 25 ML over US 50 ML & SH 47 ML
Built 2002
SH 47 ML SBND over CITY ST UP RR
Built 1984
SH 47 ML NB over CITY ST UP RR
Built 1999
EB EXIT RAMP over DRAINAGE
Built 1999
MEL HARMON DR. over MALL DR DRGWRR
Built 1976
PUEBLO MALL DRIVE over UNNAMED DRAINAGE
Built 1980
SH 47 ML EBND over FOUNTAIN CREEK
Built 1984
SH 47 ML WBND over FOUNTAIN CREEK
Built 1968
JERRY MURPHY ROAD over UNNAMED WASH
Built 1978
Bridge Details
- Structure #
- K-18-FB
- Year Built
- 2005
- Length
- 61 m (200.1 ft)
- Max Span
- 30.1 m
- Width
- 35.6 m (116.8 ft)
- Lanes
- 4
- Daily Traffic
- 36,000
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.