SH 47 ML EBND over FOUNTAIN CREEK
0.5 MI E OF I-25 PUEBLO · County 101, Colorado · Built 1984 · 3 Lanes · 16,500 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
38.308078, -104.603742
This bridge is in worse condition than 21.9% of bridges in County 101. The average bridge in Colorado is 0 years old; this one is 42 years old.
Nearby Bridges
SH 47 ML WBND over FOUNTAIN CREEK
Built 1968
DILLON DRIVE over UNNAMED DRAINAGE
Built 2000
JERRY MURPHY ROAD over SH 47 ML
Built 1977
EB EXIT RAMP over DRAINAGE
Built 1999
JERRY MURPHY ROAD over UNNAMED WASH
Built 1978
SH 47 ML SBND over CITY ST UP RR
Built 1984
SH 47 ML NB over CITY ST UP RR
Built 1999
PUEBLO MALL DRIVE over UNNAMED DRAINAGE
Built 1980
MEL HARMON DR. over MALL DR DRGWRR
Built 1976
NORTH DILLON DRIVE over UNION PACIFIC RR
Built 2000
Bridge Details
- Structure #
- K-18-FO
- Year Built
- 1984
- Length
- 159.5 m (523.3 ft)
- Max Span
- 26.5 m
- Width
- 15.7 m (51.5 ft)
- Lanes
- 3
- Daily Traffic
- 16,500
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.