DILLON DRIVE over UNNAMED DRAINAGE
200 ft S of SH47 · County 101, Colorado · Built 2000 · 8 Lanes · 18,466 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
38.306389, -104.606794
This bridge is in worse condition than 36.2% of bridges in County 101. The average bridge in Colorado is 0 years old; this one is 26 years old.
Nearby Bridges
EB EXIT RAMP over DRAINAGE
Built 1999
SH 47 ML WBND over FOUNTAIN CREEK
Built 1968
SH 47 ML EBND over FOUNTAIN CREEK
Built 1984
PUEBLO MALL DRIVE over UNNAMED DRAINAGE
Built 1980
MEL HARMON DR. over MALL DR DRGWRR
Built 1976
SH 47 ML NB over CITY ST UP RR
Built 1999
SH 47 ML SBND over CITY ST UP RR
Built 1984
I 25 ML over US 50 ML & SH 47 ML
Built 2002
NORTH DILLON DRIVE over UNION PACIFIC RR
Built 2000
JERRY MURPHY ROAD over SH 47 ML
Built 1977
Bridge Details
- Structure #
- PUEDIL-.05-SH47
- Year Built
- 2000
- Length
- 8 m (26.2 ft)
- Max Span
- 3.8 m
- Width
- 67.8 m (222.4 ft)
- Lanes
- 8
- Daily Traffic
- 18,466
- Material
- Concrete
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.