EB EXIT RAMP over DRAINAGE

0.2 MILES E OF I25 · County 101, Colorado · Built 1999 · 1 Lanes · 303 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
K-18-GF
Year Built
1999
Length
7.9 m (25.9 ft)
Max Span
3.8 m
Width
40.5 m (132.9 ft)
Lanes
1
Daily Traffic
303
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.