DILLON DR. EAST FR over TERRAIN
AT DILLON DRIVE INTERCHAN · County 101, Colorado · Built 2024 · 1 Lanes · 400 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
38.337542, -104.618967
This bridge is in worse condition than 21.9% of bridges in County 101. The average bridge in Colorado is 0 years old; this one is 2 years old.
Nearby Bridges
DILLON DRIVE over I25 ML
Built 2015
I 25 ML NBND over Drew Dix Parkway
Built 1960
I 25 ML SBND over Drew Dix Parkway
Built 1960
I 25 ML over DRAW
Built 1928
I 25 ML over EAGLE RIDGE BLVD.
Built 2005
COUNTY ROAD 501 over DRY WASH
Built 1995
I 25 ML over DRAW
Built 1928
NORTH DILLON DRIVE over UNION PACIFIC RR
Built 2000
JERRY MURPHY ROAD over UNNAMED WASH
Built 1978
I 25 ML over US 50 ML & SH 47 ML
Built 2002
Bridge Details
- Structure #
- K-18-HC
- Year Built
- 2024
- Length
- 139.9 m (459 ft)
- Max Span
- 34.2 m
- Width
- 7 m (23 ft)
- Lanes
- 1
- Daily Traffic
- 400
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.