PINON ROAD over FOUNTAIN CREEK

2 MI NE EXIT 110 I-25 · County 101, Colorado · Built 2004 · 2 Lanes · 217 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
PUCO 0.51-110B
Year Built
2004
Length
248.9 m (816.6 ft)
Max Span
40.2 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
217
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.