I 25 ML SBND over YOUNG HOLLOW
14.3 M S El Paso-Pueblo · County 101, Colorado · Built 1998 · 2 Lanes · 17,500 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
38.488322, -104.621272
This bridge is in worse condition than 21.9% of bridges in County 101. The average bridge in Colorado is 0 years old; this one is 28 years old.
Nearby Bridges
I 25 ML NBND over YOUNG HOLLOW
Built 1958
I 25 ML NBND over DRAW
Built 1958
I 25 ML SBND over DRAW
Built 2021
I 25 ML NBND over DRAW
Built 1958
I 25 ML NBND over SAND CREEK
Built 1929
I 25 ML SBND over SAND CREEK
Built 1958
CO RD 501/Overton over UNNAMED DRAINAGE
Built 1994
BOCA RATON HEIGHTS over SAND CREEK
Built 2004
PINON ROAD over FARM ROAD A
Built 2004
PINON ROAD over FOUNTAIN CREEK
Built 2004
Bridge Details
- Structure #
- K-18-GB
- Year Built
- 1998
- Length
- 52 m (170.6 ft)
- Max Span
- 25.3 m
- Width
- 12.3 m (40.4 ft)
- Lanes
- 2
- Daily Traffic
- 17,500
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.