SH 30 ML/HAVANA ST over CHERRY CREEK
@ DARTMOUTH IN DENVER · County 031, Colorado · Built 2010 · 6 Lanes · 26,000 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
39.659033, -104.866181
This bridge is in worse condition than 26.5% of bridges in County 031. The average bridge in Colorado is 0 years old; this one is 16 years old.
Nearby Bridges
I 225 ML SBND over CHERRY CREEK
Built 2005
I 225 ML NBND over CHERRY CREEK
Built 1971
PED BRIDGE over HIGHLINE CANAL
Built 1983
SB I225 RAMP TO 83 over RTD UNDERPASS R
Built 2003
SH 225 RAMP over PEDESTRIAN UNDERPASS
Built 2003
S YOSEMITE STREET over HIGHLINE CANAL
Built 1979
I 225 ML SBND over PEDESTRIAN UNDERPASS
Built 2002
I 225 ML NBND over PEDESTRIAN UNDERPASS
Built 2003
I 225 RAMP over PEDESTRIAN UNDERPASS
Built 2003
SB 225 RAMP TO 83 over SH 83 ML R
Built 2002
Bridge Details
- Structure #
- F-17-WP
- Year Built
- 2010
- Length
- 42 m (137.8 ft)
- Max Span
- 14.6 m
- Width
- 32.3 m (106 ft)
- Lanes
- 6
- Daily Traffic
- 26,000
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Single or Spread
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,427,000
- Total Project Cost
- $2,141,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.