SB 225 RAMP TO 83 over SH 83 ML R

IN AURORA · County 005, Colorado · Built 2002 · 1 Lanes · 62,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
F-17-KJ
Year Built
2002
Length
202.9 m (665.7 ft)
Max Span
52 m
Width
9 m (29.5 ft)
Lanes
1
Daily Traffic
62,500
Material
Steel Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.