SB I225 RAMP TO 83 over RTD UNDERPASS R
IN AURORA · County 005, Colorado · Built 2003 · 1 Lanes · 26,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
39.658333, -104.847681
This bridge is in worse condition than 31.1% of bridges in County 005. The average bridge in Colorado is 0 years old; this one is 23 years old.
Nearby Bridges
SH 225 RAMP over PEDESTRIAN UNDERPASS
Built 2003
I 225 ML SBND over PEDESTRIAN UNDERPASS
Built 2002
I 225 ML NBND over PEDESTRIAN UNDERPASS
Built 2003
I 225 RAMP over PEDESTRIAN UNDERPASS
Built 2003
SB 225 RAMP TO 83 over SH 83 ML R
Built 2002
I 225 ML SBND over SH 83 ML
Built 2002
I 225 ML NBND over SH 83
Built 2002
SH 83 RAMP TO I225 over I225 SH83 RAMP
Built 2002
SH 83 ML over OVER VAUGHN WAY
Built 2003
I 225 ML NBND over CHERRY CREEK
Built 1971
Bridge Details
- Structure #
- F-17-KI
- Year Built
- 2003
- Length
- 65.6 m (215.2 ft)
- Max Span
- 23.6 m
- Width
- 9.7 m (31.8 ft)
- Lanes
- 1
- Daily Traffic
- 26,000
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.