I 225 ML NBND over CHERRY CREEK

3.1 MI E of I-25 · County 005, Colorado · Built 1971 · 4 Lanes · 68,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
F-17-DY
Year Built
1971
Reconstructed
2007
Length
71.6 m (234.9 ft)
Max Span
34.7 m
Width
24.6 m (80.7 ft)
Lanes
4
Daily Traffic
68,000
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.