I 225 ML SBND over CHERRY CREEK

3.1 MI E of I-25 · County 005, Colorado · Built 2005 · 4 Lanes · 68,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
F-17-OK
Year Built
2005
Length
81.8 m (268.4 ft)
Max Span
40.2 m
Width
22.9 m (75.1 ft)
Lanes
4
Daily Traffic
68,000
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.