SH 83 ML over CHERRY CRK DAM SPILLWAY
IN AURORA · County 005, Colorado · Built 1976 · 11 Lanes · 76,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
39.654189, -104.832611
This bridge is in worse condition than 49% of bridges in County 005. The average bridge in Colorado is 0 years old; this one is 50 years old.
Nearby Bridges
SH 83 RAMP over PEDESTRIAN/BIKEWAY
Built 2003
SH 83 ML/PARKER RD over HAMPDEN AVE.
Built 2003
SH 83 ML over OVER VAUGHN WAY
Built 2003
SH 83 RAMP TO I225 over I225 SH83 RAMP
Built 2002
I 225 ML NBND over SH 83
Built 2002
I 225 ML SBND over SH 83 ML
Built 2002
SB 225 RAMP TO 83 over SH 83 ML R
Built 2002
I 225 RAMP over PEDESTRIAN UNDERPASS
Built 2003
I 225 ML NBND over PEDESTRIAN UNDERPASS
Built 2003
I 225 ML SBND over PEDESTRIAN UNDERPASS
Built 2002
Bridge Details
- Structure #
- F-17-GY
- Year Built
- 1976
- Reconstructed
- 2000
- Length
- 57.5 m (188.6 ft)
- Max Span
- 28 m
- Width
- 53.3 m (174.9 ft)
- Lanes
- 11
- Daily Traffic
- 76,000
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $664,000
- Total Project Cost
- $996,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.