RAMP TO I 25 SBND over CLEAR CREEK R

.2 MI N I76; .1 MI W I25 · County 001, Colorado · Built 1992 · 2 Lanes · 121,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
E-17-NY
Year Built
1992
Length
96.2 m (315.6 ft)
Max Span
31.5 m
Width
20.4 m (66.9 ft)
Lanes
2
Daily Traffic
121,000
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,000
Total Project Cost
$3,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.