I76 WB OFF RAMP over RAMP TO I 25 NBND R

0.1 MI E. OF I25+I76 JCT · County 001, Colorado · Built 1991 · 1 Lanes · 37,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
E-17-OE
Year Built
1991
Length
43.3 m (142.1 ft)
Max Span
42.4 m
Width
12.5 m (41 ft)
Lanes
1
Daily Traffic
37,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.