RAMP TO I 76 WBND over RAMP CLEAR CREEK R

NW OF I76 and I25 INT · County 001, Colorado · Built 1992 · 1 Lanes · 37,500 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
8
Very Good

Bridge Details

Structure #
E-17-NX
Year Built
1992
Length
245.6 m (805.8 ft)
Max Span
61 m
Width
9.8 m (32.2 ft)
Lanes
1
Daily Traffic
37,500
Material
Steel Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.