I 76 ML WBND over RAMP TO I 25 SBND

0.1 MI W. OF I25+I76 JCT · County 001, Colorado · Built 1991 · 2 Lanes · 37,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
E-17-OB
Year Built
1991
Length
43.5 m (142.7 ft)
Max Span
42.4 m
Width
12.5 m (41 ft)
Lanes
2
Daily Traffic
37,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.