RAMP TO I 25 NBND over CLEAR CREEK R
.2 MI N 76; .1 MI E I-25 · County 001, Colorado · Built 1992 · 1 Lanes · 121,000 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
39.821197, -104.982222
This bridge is in worse condition than 22.8% of bridges in County 001. The average bridge in Colorado is 0 years old; this one is 34 years old.
Nearby Bridges
I 25 ML NBND over CLEAR CREEK
Built 1993
I25 NB RAMP TO 224 over CLEAR CREEK R
Built 1998
I 25 ML SBND & HOV over CLEAR CREEK
Built 1993
ACCESS ROAD over RAMP TO I 25 NBND R
Built 1993
RAMP TO I 25 SBND over CLEAR CREEK R
Built 1992
RAMP TO I 76 WBND over RAMP CLEAR CREEK R
Built 1992
I 25 RAMP over HOV RAMP R
Built 1998
I76 WB OFF RAMP over RAMP TO I 25 NBND R
Built 1991
US 224 ML-70TH AVE over I 25 ML
Built 1991
US 36 ML over SH 224 ML/N BROADWAY
Built 1986
Bridge Details
- Structure #
- E-17-NW
- Year Built
- 1992
- Length
- 72.8 m (238.8 ft)
- Max Span
- 24.4 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 1
- Daily Traffic
- 121,000
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Single or Spread
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.