US 36 ML WBND over BOULDER CREEK

28th STREET IN BOULDER · County 013, Colorado · Built 1952 · 2 Lanes · 18,000 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
7
Good
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
D-15-AR
Year Built
1952
Reconstructed
2005
Length
29.4 m (96.5 ft)
Max Span
10.7 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
18,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.