SH 7 ML EBND over BOULDER CREEK
ARAPAHOE AVENUE · County 013, Colorado · Built 1966 · 3 Lanes · 15,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
40.014639, -105.245006
This bridge is in worse condition than 57.9% of bridges in County 013. The average bridge in Colorado is 0 years old; this one is 60 years old.
Nearby Bridges
SH 7 ML WBND over BOULDER CREEK
Built 1938
SH 157 ML over BOULDER CREEK
Built 1981
SH 7 (ARAPAHOE) over BIKE/PED UNDERPASS
Built 2006
SH 7 ML over BEAR CANYON CREEK
Built 1985
SH 157 ML over SKUNK CREEK
Built 1978
SH 157 ML over WALNUT STREET
Built 1981
30th Street over Boulder Creek
Built 1963
Colorado Avenue over Skunk Creek
Built 1979
MONROE DRIVE over EMPSON DITCH
Built 2020
SH 157 ML over PEARL STREET
Built 1985
Bridge Details
- Structure #
- D-15-AV
- Year Built
- 1966
- Reconstructed
- 1986
- Length
- 47.2 m (154.9 ft)
- Max Span
- 15.2 m
- Width
- 13.6 m (44.6 ft)
- Lanes
- 3
- Daily Traffic
- 15,000
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $844,000
- Total Project Cost
- $928,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.