US 36 ML EBND over BOULDER CREEK

IN BOULDER · County 013, Colorado · Built 1960 · 3 Lanes · 18,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
D-15-AX
Year Built
1960
Length
29.4 m (96.5 ft)
Max Span
10.7 m
Width
11.9 m (39 ft)
Lanes
3
Daily Traffic
18,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$512,000
Total Project Cost
$563,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.