EBND US 36 ML over US 36 SPUR/BASELINE RD

IN BOULDER · County 013, Colorado · Built 1963 · 2 Lanes · 16,500 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
D-15-AZ
Year Built
1963
Reconstructed
1977
Length
54.5 m (178.8 ft)
Max Span
29.2 m
Width
15.8 m (51.8 ft)
Lanes
2
Daily Traffic
16,500
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.