30th Street over Empson Ditch

0.59 Mi N of Baseline Rd · County 013, Colorado · Built 1963 · 4 Lanes · 16,733 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
BOLD-07-0.59-01
Year Built
1963
Length
7.6 m (24.9 ft)
Max Span
6.8 m
Width
18.9 m (62 ft)
Lanes
4
Daily Traffic
16,733
Material
Prestressed Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$149,000
Total Project Cost
$164,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.