EB BRONCOS PARKWAY over CHERRY CREEK
.6 MI EAST OF JORDAN ROAD · County 005, Colorado · Built 2004 · 2 Lanes · 7,923 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
39.578639, -104.80175
This bridge is in worse condition than 49% of bridges in County 005. The average bridge in Colorado is 0 years old; this one is 22 years old.
Nearby Bridges
WB BRONCOS PARKWAY over CHERRY CREEK
Built 2004
SH 83 ML over DRAW
Built 1978
NB JORDAN ROAD over HAPPY CANYON CREEK
Built 2000
SB JORDAN ROAD over HAPPY CANYON CREEK
Built 2001
FRASER STREET over DOVE CREEK
Built 1985
E. FREMONT DR over DOVE CREEK
Built 1985
SH 83 ML over WASH
Built 1989
SH 83 RAMP over Multi-use Path
Built 2015
SH 83 ML over SH 88 ML
Built 2012
BLACKHAWK ST over CHERRY CREEK TRIB
Built 1994
Bridge Details
- Structure #
- CENT 46-13.6E
- Year Built
- 2004
- Length
- 206.7 m (678.1 ft)
- Max Span
- 39.9 m
- Width
- 11.1 m (36.4 ft)
- Lanes
- 2
- Daily Traffic
- 7,923
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.