SH 83 ML over SH 88 ML
SH 83/SH 88 · County 005, Colorado · Built 2012 · 8 Lanes · 59,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
39.594481, -104.801683
This bridge is in worse condition than 31.1% of bridges in County 005. The average bridge in Colorado is 0 years old; this one is 14 years old.
Nearby Bridges
SH 83 RAMP over Multi-use Path
Built 2015
SH 88 ML/ARAP RD over CHERRY CREEK
Built 2015
E. FREMONT DR over DOVE CREEK
Built 1985
SH 83 ML over DRAW
Built 1978
FRASER STREET over DOVE CREEK
Built 1985
WB BRONCOS PARKWAY over CHERRY CREEK
Built 2004
FRASER STREET over PINEY CREEK
Built 1998
EB BRONCOS PARKWAY over CHERRY CREEK
Built 2004
JORDAN ROAD over WINDMILL CREEK
Built 2004
SH 83 ML over PINEY CREEK
Built 1967
Bridge Details
- Structure #
- F-17-QU
- Year Built
- 2012
- Length
- 80.4 m (263.8 ft)
- Max Span
- 42.1 m
- Width
- 41.8 m (137.1 ft)
- Lanes
- 8
- Daily Traffic
- 59,000
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Single or Spread
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.