SH 83 RAMP over Multi-use Path
0.1 MI SW ARAPAHOE ROAD · County 005, Colorado · Built 2015 · 2 Lanes · 41,000 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
39.593342, -104.797417
This bridge is in worse condition than 31.1% of bridges in County 005. The average bridge in Colorado is 0 years old; this one is 11 years old.
Nearby Bridges
SH 83 ML over SH 88 ML
Built 2012
SH 83 ML over DRAW
Built 1978
E. FREMONT DR over DOVE CREEK
Built 1985
SH 88 ML/ARAP RD over CHERRY CREEK
Built 2015
FRASER STREET over DOVE CREEK
Built 1985
WB BRONCOS PARKWAY over CHERRY CREEK
Built 2004
EB BRONCOS PARKWAY over CHERRY CREEK
Built 2004
BUCKLEY ROAD over PINEY CREEK
Built 2003
FRASER STREET over PINEY CREEK
Built 1998
SH 83 ML over PINEY CREEK
Built 1967
Bridge Details
- Structure #
- F-17-XH
- Year Built
- 2015
- Length
- 6.4 m (21 ft)
- Max Span
- 6.4 m
- Width
- 36.6 m (120.1 ft)
- Lanes
- 2
- Daily Traffic
- 41,000
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.