FRASER STREET over DOVE CREEK
.1 MI S OF FREMONT · County 005, Colorado · Built 1985 · 2 Lanes · 780 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
39.584272, -104.812114
This bridge is in worse condition than 49% of bridges in County 005. The average bridge in Colorado is 0 years old; this one is 41 years old.
Nearby Bridges
E. FREMONT DR over DOVE CREEK
Built 1985
BLACKHAWK ST over CHERRY CREEK TRIB
Built 1994
WB BRONCOS PARKWAY over CHERRY CREEK
Built 2004
EB BRONCOS PARKWAY over CHERRY CREEK
Built 2004
SH 88 ML/ARAP RD over CHERRY CREEK
Built 2015
SH 83 ML over DRAW
Built 1978
SH 83 ML over SH 88 ML
Built 2012
NB JORDAN ROAD over HAPPY CANYON CREEK
Built 2000
SB JORDAN ROAD over HAPPY CANYON CREEK
Built 2001
SH 83 RAMP over Multi-use Path
Built 2015
Bridge Details
- Structure #
- CENT 34-12.9
- Year Built
- 1985
- Length
- 9.6 m (31.5 ft)
- Max Span
- 3.7 m
- Width
- 18.1 m (59.4 ft)
- Lanes
- 2
- Daily Traffic
- 780
- Material
- Concrete
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.