BLACKHAWK ST over CHERRY CREEK TRIB
.2 MI S OF FREMONT AVE · County 005, Colorado · Built 1994 · 3 Lanes · 11,510 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
39.581711, -104.823264
This bridge is in worse condition than 49% of bridges in County 005. The average bridge in Colorado is 0 years old; this one is 32 years old.
Nearby Bridges
POTOMAC ST over CHERRY CREEK TRIB
Built 1986
FRASER STREET over DOVE CREEK
Built 1985
E. FREMONT DR over DOVE CREEK
Built 1985
JORDAN ROAD over WINDMILL CREEK
Built 2004
SH 88 ML/ARAP RD over CHERRY CREEK
Built 2015
SB JORDAN ROAD over HAPPY CANYON CREEK
Built 2001
WB BRONCOS PARKWAY over CHERRY CREEK
Built 2004
NB JORDAN ROAD over HAPPY CANYON CREEK
Built 2000
EB BRONCOS PARKWAY over CHERRY CREEK
Built 2004
COUNTY LINE ROAD over LOCAL DRAINAGE
Built 2002
Bridge Details
- Structure #
- ARA 49.2-12.2
- Year Built
- 1994
- Length
- 8 m (26.2 ft)
- Max Span
- 3.9 m
- Width
- 18.5 m (60.7 ft)
- Lanes
- 3
- Daily Traffic
- 11,510
- Material
- Concrete
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.