2ND AVENUE over HIGHLINE CANAL

0.2 MI E OF PEORIA ST · County 005, Colorado · Built 1988 · 2 Lanes · 1,805 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
AUR08.0-E.5A
Year Built
1988
Length
7.7 m (25.3 ft)
Max Span
7.7 m
Width
20 m (65.6 ft)
Lanes
2
Daily Traffic
1,805
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.