2ND AVENUE over HIGHLINE CANAL
0.2 MI E OF PEORIA ST · County 005, Colorado · Built 1988 · 2 Lanes · 1,805 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
39.718333, -104.842058
This bridge is in worse condition than 31.1% of bridges in County 005. The average bridge in Colorado is 0 years old; this one is 38 years old.
Nearby Bridges
PEORIA STREET over HIGHLINE CANAL
Built 1987
MOLINE STREET over HIGHLINE CANAL
Built 1975
I225 SBND over 2ND AVE.
Built 2004
I225 NBND over 2ND AVE
Built 2004
ALAMEDA AVE over I 225 ML
Built 1969
RAMP FROM I225 SB over I 225 ML
Built 2000
RAMP TO I225 SB over I 225 ML
Built 2000
I225 ML SBND over SH 30 ML
Built 2004
I225 ML NBND over SH 30 ML
Built 2004
ALAMEDA AVE over HIGHLINE CANAL
Built 1970
Bridge Details
- Structure #
- AUR08.0-E.5A
- Year Built
- 1988
- Length
- 7.7 m (25.3 ft)
- Max Span
- 7.7 m
- Width
- 20 m (65.6 ft)
- Lanes
- 2
- Daily Traffic
- 1,805
- Material
- Concrete
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.