I225 SBND over 2ND AVE.
IN AURORA · County 005, Colorado · Built 2004 · 4 Lanes · 68,500 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
39.718628, -104.826814
This bridge is in worse condition than 49% of bridges in County 005. The average bridge in Colorado is 0 years old; this one is 22 years old.
Nearby Bridges
I225 NBND over 2ND AVE
Built 2004
SABLE BLVD over HIGHLINE CANAL
Built 1975
RAMP FROM I225 SB over I 225 ML
Built 2000
I225 ML SBND over SH 30 ML
Built 2004
I225 ML NBND over SH 30 ML
Built 2004
ALAMEDA AVE over I 225 ML
Built 1969
RAMP TO I225 SB over I 225 ML
Built 2000
DILLON WAY over LOCAL DRAINAGE
Built 1970
SH 30 ML/6TH AVE over TOLLGATE CREEK
Built 1978
2ND AVENUE over HIGHLINE CANAL
Built 1988
Bridge Details
- Structure #
- F-17-IX
- Year Built
- 2004
- Length
- 26.4 m (86.6 ft)
- Max Span
- 25.5 m
- Width
- 22.9 m (75.1 ft)
- Lanes
- 4
- Daily Traffic
- 68,500
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Single or Spread
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.