I225 ML SBND over SH 30 ML

IN AURORA · County 005, Colorado · Built 2004 · 3 Lanes · 70,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
F-17-LV
Year Built
2004
Length
62.6 m (205.4 ft)
Max Span
32.5 m
Width
19.2 m (63 ft)
Lanes
3
Daily Traffic
70,000
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.