RAMP TO I225 SB over I 225 ML

WB ALAMEDA TO I225 SB · County 005, Colorado · Built 2000 · 2 Lanes · 132,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
F-17-AX
Year Built
2000
Length
130.1 m (426.8 ft)
Max Span
46.9 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
132,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,000
Total Project Cost
$3,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.