PEORIA STREET over HIGHLINE CANAL

0.5 MI S OF 6TH AVE · County 005, Colorado · Built 1987 · 4 Lanes · 13,515 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
AUR07.6-E.0A
Year Built
1987
Length
9.4 m (30.8 ft)
Max Span
8.7 m
Width
18.9 m (62 ft)
Lanes
4
Daily Traffic
13,515
Material
Prestressed Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.