NACIMIENTO RD over STONEY CREEK RESVR INLET
SW S. MIGUELITO L S12A/25 · County 053, California · Built 1955 · 2 Lanes · 8 vehicles/day
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
35.962678, -121.279992
This bridge is in worse condition than 66.7% of bridges in County 053. The average bridge in California is 0 years old; this one is 71 years old.
Nearby Bridges
SAN MIGUELITO LP R over STONEY CREEK
Built 1967
NACIMIENTO ROAD over SAN ANTONIO RIVER
Built 1940
RANGE RD over MISSION CREEK
Built 1950
ACCESS ROAD over DRAINAGE ENGINEER RESRV
Built 2002
LOS BUEYOS ROAD over LOS BUEYOS CREEK
Built 1994
MISSION CREEK ROAD over MISSION CREEK
Built 1965
RUBY CANYON ROAD over DRAINAGE KD RESERVOIR
Built 2002
JOLON RD over JOLON CREEK
Built 1942
NO DATA ENTERED over NACIMIENTO RIVER
Built 1965
MILPITAS ROAD over DRAINAGE SAN ANTONIO RIV
Built 2006
Bridge Details
- Structure #
- DAPFORLIG000764
- Year Built
- 1955
- Reconstructed
- 1996
- Length
- 16.2 m (53.1 ft)
- Max Span
- 16.2 m
- Width
- 9.4 m (30.8 ft)
- Lanes
- 2
- Daily Traffic
- 8
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- Other
- Last Inspected
- N/A
- Est. Improvement
- $1,000
- Total Project Cost
- $2,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.