SAN MIGUELITO LP R over STONEY CREEK

S SAN MIGUELITO RANCH S15 · County 053, California · Built 1967 · 2 Lanes · 10 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
DAPFORLIG000756
Year Built
1967
Reconstructed
2007
Length
7.9 m (25.9 ft)
Max Span
7.9 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
10
Material
Concrete
Design
Slab
Owner
Other
Last Inspected
N/A
Est. Improvement
$1,000
Total Project Cost
$2,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.