JOLON RD over JOLON CREEK
NEAR MISSION RD · County 053, California · Built 1942 · 2 Lanes · 1,800 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
35.966122, -121.172672
This bridge is in worse condition than 6.1% of bridges in County 053. The average bridge in California is 0 years old; this one is 84 years old.
Nearby Bridges
RUBY CANYON ROAD over DRAINAGE KD RESERVOIR
Built 2002
NACIMIENTO ROAD over SAN ANTONIO RIVER
Built 1940
SAM JONES ROAD over SAN ANTONIO RIVER
Built 1968
RANGE ROAD over DRAINAGE SAN ANTONIO RIV
Built 1965
ACCESS ROAD over DRAINAGE ENGINEER RESRV
Built 2002
RANGE RD over MISSION CREEK
Built 1950
NACIMIENTO RD over STONEY CREEK RESVR INLET
Built 1955
MISSION CREEK ROAD over MISSION CREEK
Built 1965
SAN MIGUELITO LP R over STONEY CREEK
Built 1967
INTERLAKE RD over SAN ANTONIO RIVER
Built 1964
Bridge Details
- Structure #
- 44C0027
- Year Built
- 1942
- Length
- 24.4 m (80.1 ft)
- Max Span
- 9.1 m
- Width
- 9.7 m (31.8 ft)
- Lanes
- 2
- Daily Traffic
- 1,800
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.