INTERLAKE RD over SAN ANTONIO RIVER
3 MI S OF JOLON RD. · County 053, California · Built 1964 · 2 Lanes · 260 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
35.896972, -121.088808
This bridge is in worse condition than 66.7% of bridges in County 053. The average bridge in California is 0 years old; this one is 62 years old.
Nearby Bridges
RANGE ROAD over DRAINAGE SAN ANTONIO RIV
Built 1965
SAM JONES ROAD over SAN ANTONIO RIVER
Built 1968
RANGE ROAD over EL PIOJO CREEK
Built 1969
JOLON RD over JOLON CREEK
Built 1942
PALISADES ROAD over NACIMIENTO RIVER
Built 1994
PALISADES ROAD over DRAINAGE NACIMIENTO RIV
Built 2012
SALMON CREEK ROAD over DRAINAGE SALMON CREEK
Built 1967
SAN ANTONIO ROAD over HARRIS CREEK
Built 1969
RUBY CANYON ROAD over DRAINAGE KD RESERVOIR
Built 2002
Bridge Details
- Structure #
- 44C0047
- Year Built
- 1964
- Length
- 94.5 m (310 ft)
- Max Span
- 25.9 m
- Width
- 8.8 m (28.9 ft)
- Lanes
- 2
- Daily Traffic
- 260
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.