LOS BUEYOS ROAD over LOS BUEYOS CREEK
BETWEEN SEC 19/23 · County 053, California · Built 1994 · 1 Lanes · 1 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
35.894311, -121.2669
This bridge is in worse condition than 66.7% of bridges in County 053. The average bridge in California is 0 years old; this one is 32 years old.
Nearby Bridges
SAN MIGUELITO LP R over STONEY CREEK
Built 1967
PALISADES ROAD over DRAINAGE NACIMIENTO RIV
Built 2012
NACIMIENTO RD over STONEY CREEK RESVR INLET
Built 1955
PALISADES ROAD over NACIMIENTO RIVER
Built 1994
SALMON CREEK ROAD over DRAINAGE SALMON CREEK
Built 1967
RANGE ROAD over EL PIOJO CREEK
Built 1969
NACIMIENTO ROAD over SAN ANTONIO RIVER
Built 1940
JOLON RD over JOLON CREEK
Built 1942
SAM JONES ROAD over SAN ANTONIO RIVER
Built 1968
RUBY CANYON ROAD over DRAINAGE KD RESERVOIR
Built 2002
Bridge Details
- Structure #
- DAPFORLIG000757
- Year Built
- 1994
- Length
- 15.2 m (49.9 ft)
- Max Span
- 15.2 m
- Width
- 4.7 m (15.4 ft)
- Lanes
- 1
- Daily Traffic
- 1
- Material
- Steel
- Design
- Truss - Thru
- Owner
- Other
- Last Inspected
- N/A
- Est. Improvement
- $14,000
- Total Project Cost
- $14,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.