MILPITAS ROAD over DRAINAGE SAN ANTONIO RIV

W BEAR CANYON SEC 2/5 · County 053, California · Built 2006 · 2 Lanes · 10 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Serious
Deck
6
Satisfactory
Superstructure
3
Serious
Substructure
7
Good

Bridge Details

Structure #
DAPFORLIG000750
Year Built
2006
Length
10.7 m (35.1 ft)
Max Span
10.7 m
Width
8 m (26.2 ft)
Lanes
2
Daily Traffic
10
Material
Steel
Design
Girder and Floorbeam System
Owner
Other
Last Inspected
N/A
Est. Improvement
$1,000
Total Project Cost
$1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.