RELIZ CANYON RD over DRAINAGE MISSION CREEK
N MISSION CREEK RD SEC 3 · County 053, California · Built 1994 · 1 Lanes · 1 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 4 | Poor |
Location
36.083019, -121.2518
This bridge is in worse condition than 92.9% of bridges in County 053. The average bridge in California is 0 years old; this one is 32 years old.
Nearby Bridges
MISSION CREEK ROAD over MISSION CREEK
Built 1965
MILPITAS ROAD over DRAINAGE SAN ANTONIO RIV
Built 2006
ACCESS ROAD over DRAINAGE ENGINEER RESRV
Built 2002
RANGE RD over MISSION CREEK
Built 1950
NACIMIENTO ROAD over SAN ANTONIO RIVER
Built 1940
RUBY CANYON ROAD over DRAINAGE KD RESERVOIR
Built 2002
NACIMIENTO RD over STONEY CREEK RESVR INLET
Built 1955
JOLON RD over JOLON CREEK
Built 1942
NO DATA ENTERED over NACIMIENTO RIVER
Built 1965
MILPITAS ROAD over N FK SAN ANTONIO CREEK
Built 1945
Bridge Details
- Structure #
- DAPFORLIG000751
- Year Built
- 1994
- Length
- 12.2 m (40 ft)
- Max Span
- 12.2 m
- Width
- 5.6 m (18.4 ft)
- Lanes
- 1
- Daily Traffic
- 1
- Material
- Steel
- Design
- Truss - Thru
- Owner
- Other
- Last Inspected
- N/A
- Est. Improvement
- $1,000
- Total Project Cost
- $2,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.