MISSION CENTER RD over SAN DIEGO RIVER

0.3MI N/O RTE I-8 · County 073, California · Built 1990 · 6 Lanes · 26,898 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
57C0580
Year Built
1990
Length
21.3 m (69.9 ft)
Max Span
2.7 m
Width
42.6 m (139.8 ft)
Lanes
6
Daily Traffic
26,898
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.