STATE ROUTE 163 over SAN DIEGO RI W8-N163 CAM

11-SD-163-3.94-SD · County 073, California · Built 1989 · 1 Lanes · 20,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
57 0980S
Year Built
1989
Length
181.6 m (595.8 ft)
Max Span
36.6 m
Width
8.4 m (27.6 ft)
Lanes
1
Daily Traffic
20,500
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.