E8-MISSION CENTER over E8-N163 & N163-E8 RAMPS
11-SD-008-2.56-SD · County 073, California · Built 1978 · 1 Lanes · 5,800 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
32.765183, -117.153847
This bridge is in worse condition than 18.4% of bridges in County 073. The average bridge in California is 0 years old; this one is 48 years old.
Nearby Bridges
MISSION CENTER RD over INTERSTATE 8
Built 1978
MISSION CENTER RD over SAN DIEGO RIVER
Built 1990
INTERSTATE 8 over E8-N163 CONNECTOR RAMP
Built 1959
STATE ROUTE 163 over SAN DIEGO RI W8-N163 CAM
Built 1989
STATE ROUTE 163 over SAN DIEGO RIVER
Built 1946
E&W8-N163 CONNECT over CAMINO DE LA REINA SD RI
Built 1970
FRIARS ROAD over MURRAY CANYON
Built 1970
N163-W8 CONNECTOR over RTE 163 S163-W8 N163-W8
Built 1991
E8-N163 & S163-E8 over STATE ROUTE 163
Built 1988
INTERSTATE 8 over STATE ROUTE 163
Built 1959
Bridge Details
- Structure #
- 57 0358S
- Year Built
- 1978
- Length
- 227.1 m (745.1 ft)
- Max Span
- 65.2 m
- Width
- 8.4 m (27.6 ft)
- Lanes
- 1
- Daily Traffic
- 5,800
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.