FRIARS ROAD over MURRAY CANYON
500FT E/O SR-163 · County 073, California · Built 1970 · 10 Lanes · 64,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
32.772622, -117.157278
This bridge is in worse condition than 18.4% of bridges in County 073. The average bridge in California is 0 years old; this one is 56 years old.
Nearby Bridges
MISSION CENTER RD over SAN DIEGO RIVER
Built 1990
FRIARS ROAD over RTE 163 & RAMPS
Built 1970
FRIARS RD over MISSION CENTER RD
Built 1968
FRIARS RD over SAN DIEGO CON CO UC
Built 1968
STATE ROUTE 163 over SAN DIEGO RI W8-N163 CAM
Built 1989
STATE ROUTE 163 over SAN DIEGO RIVER
Built 1946
E&W8-N163 CONNECT over CAMINO DE LA REINA SD RI
Built 1970
MISSION CENTER RD over INTERSTATE 8
Built 1978
E8-MISSION CENTER over E8-N163 & N163-E8 RAMPS
Built 1978
INTERSTATE 8 over E8-N163 CONNECTOR RAMP
Built 1959
Bridge Details
- Structure #
- 57C0233
- Year Built
- 1970
- Length
- 8.8 m (28.9 ft)
- Max Span
- 7.6 m
- Width
- 75 m (246.1 ft)
- Lanes
- 10
- Daily Traffic
- 64,000
- Material
- Concrete
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.